Our Work
{primary_categories}{primary_category_name}{/primary_categories} Back To Full List

Topeka Correctional Facility

Boiler plant up-grade. Remove two (2)-100 hp Kewanee hot water boilers and replace with three (3) 90+ efficient ARECO hot water boilers. Removed three (3) hot water circulating pumps and replaced with two (2) new efficient hot water pumps.